In last October, our company started construction of a new logistical hall of more than 10,000 sq.m. floor area in Veszprém, within the boundaries of Szentkirályszabadja, a ghost town located next to the airfield.
Acts of benefaction and being solicitous for people in need is a key component of our social responsibility pro-gram. As early as this January, we joined to a nationwide initiative focused on providing support to girls and women facing deprivation.
For a long time past, Grabarics Constuction Ltd. has been committed for contributing to the development of the Hungarian market of construction and the safe implementation of build-ings. We attach importance to co-operating with partners that adhere to concepts of quality and reliability, like we do.
In early 2022, Grabarics Reinforced Concrete (GRC) will celebrate the fifth anniversary of commencement of manufacturing. GRC gathered much professional experience during the past years. Based on the number and volume of the ongoing projects, we can refer to the rapid and unbroken trend of growth of the company's output that has successively imposed new challenges, as well.
During the trip starting from Budapest, the students were given an insight into the operation of the reinforced concrete prefabrication plant, and were able to gain theoretical information about the advantages of prefabricated elements and the diversity of technical solutions.
The theme of this year’s drawing competition is SAFETY THAT CONNECTS US, which this year is a great opportunity to mark the World Day for Safety and Health at Work.
In December 2021, Szeged was enriched with a large-scale facility when the Szeged Multifunctional Handball Hall (also known as the PICK Aréna) was inaugurated. The complete prefabricated structure of the sports centre was designed and the elements were manufactured and installed on site by Grabarics Reinforced Concrete.
Grabarics Development’s project under preparation will be a 5-apartment condominium at 16 Kapy Street, Pasarét, Budapest, District II. The preliminary design works are currently underway.