A green-field project having a budget of several hundreds of million Forints is being implemented in Veszprém to build a new logistic depot. The foundation stone of the new operation hall was laid on March 22 in the county town of the Bakony region.
We are invited by Hofer Magyarország Ltd. to build a new ALDI food store in Miskolc by reshaping an existing two-storey building. Completion of the technical phase of the construction is expected by July 2022.
On April 27 of 2022, the topping bouquet was placed atop the new HQ building of the National Media and Info-communications Authority (NMIA) built in Visegrádi Street of Budapest. The construction work had been started by Grabarics Ltd. in May 2020.
During the trip starting from Budapest, the students were given an insight into the operation of the reinforced concrete prefabrication plant, and were able to gain theoretical information about the advantages of prefabricated elements and the diversity of technical solutions.
The theme of this year’s drawing competition is SAFETY THAT CONNECTS US, which this year is a great opportunity to mark the World Day for Safety and Health at Work.
In December 2021, Szeged was enriched with a large-scale facility when the Szeged Multifunctional Handball Hall (also known as the PICK Aréna) was inaugurated. The complete prefabricated structure of the sports centre was designed and the elements were manufactured and installed on site by Grabarics Reinforced Concrete.
Grabarics Development’s project under preparation will be a 5-apartment condominium at 16 Kapy Street, Pasarét, Budapest, District II. The preliminary design works are currently underway.