Menu
2020. 07. 16
On strong pillars
The area of INPARK Páty will be developed with hall extension works: the production, assembly and on-site assembly of the prefabricated reinforced concrete structures will be carried out by Grabarics Vasbeton, the contract is for the construction of two parts of the building.
On strong pillars

Welfare facilities will be developed in the larger structure of 6500 m2, and storage halls will be established in the smaller part of 3,600 m2 of the building. A great help in assembling the elements of the hall is a huge crawler crane with a lifting capacity of 100 tons, which with its mobility contributes to the faster movement of the reinforced concrete elements.

On strong pillars
On strong pillars
On strong pillars